Developers · Main Contractors · Managing Agents
HIU Commissioning & Servicing Contracts
Block-wide Heat Interface Unit commissioning and annual servicing across Greater London — delivered to programme, recorded per unit, and handed over with documentation that stands up to scrutiny.
Quick answer
Collide Group carries out HIU commissioning for new-build and retrofit blocks across London, and annual HIU servicing contracts for buildings already in occupation. Every unit is commissioned or serviced to a documented checklist, recorded individually, and collated into a block-level register or compliance pack. We are a WRAS-certified Heat Interface Unit specialist based in Northolt, covering all of Greater London, with £5,000,000 public liability insurance and coverage of all major HIU brands.
Who We Work With
Contract HIU work for the people responsible for getting a block signed off — and for keeping it compliant afterwards.
Developers & Project Directors
Units commissioned, recorded and signed off in time for practical completion and handover.
Main Contractors & M&E
A specialist subcontractor for the HIU package, working to your programme and commissioning specification.
Managing Agents & Block Managers
One annual contract covering every flat in the block, with resident access handled for you.
Housing Associations & Councils
Programmed servicing across estates, with reporting that stands up to audit.
Heat Network Operators & ESCOs
Return temperature and heat meter verification that protects network efficiency and billing accuracy.
Facilities Managers
Planned maintenance cycles and priority callout cover under a single point of contact.
HIU Commissioning for New-Build & Retrofit Blocks
An HIU that has been installed but never properly commissioned will pass a visual inspection and still deliver poor hot water performance, high return temperatures and resident complaints within weeks of occupation. Commissioning is what proves each unit actually performs — and what gives you the records to demonstrate it.
Annual HIU Servicing Contracts for Occupied Blocks
Once a block is occupied the job changes: the engineering is routine, and the hard part is access, consistency and paperwork. We run the whole cycle — booking residents, attending, reporting per unit and handing you a compliance record at the end.
Running an occupied block? See our bulk HIU servicing contracts page for the full contract scope, or read what is covered in a single annual HIU service.
What You Get at Handover
Documentation is usually what holds up a handover — not the engineering. We issue it as a single pack.
Per-Unit Commissioning Records
A completed record sheet for every flat, showing the settings and readings achieved at commissioning.
Block Commissioning Register
A single register covering the whole building, so nothing is missing when the file is reviewed.
Heat Meter Schedule
Meter serial numbers and opening readings recorded per unit, ready for the billing provider.
Photographic Record
Photographs of installed units and meter readings, filed against each flat.
Snag List & Close-Out
Outstanding items logged, re-visited and signed off rather than left open at handover.
RAMS Before Mobilisation
Task-specific risk assessments and method statements issued to your team before we start on site.
Why Project Teams Choose Collide
How We Mobilise a Block Contract
Enquiry & Scope
Send us the unit schedule, drawings or a simple flat count with HIU brands. We will tell you quickly whether it is a job we can take on and when.
Site Survey
We attend site, confirm unit types and access arrangements, and check the network is ready for commissioning.
Fixed Proposal
A written proposal with scope, per-unit rate, programme and deliverables. No open-ended day rates.
Mobilisation
RAMS issued, access plan agreed, phasing confirmed with your site team or resident liaison.
Delivery & Reporting
Works carried out with progress reported as we go, so you always know the completed unit count.
Handover
Records, register and snag close-out issued as one pack for your O&M file or compliance record.
Pricing & Proposals
HIU Commissioning
Quoted per project
Priced after a site survey, based on unit count, unit type, access and the commissioning specification you need us to work to. A fixed per-unit rate in the proposal — not an open-ended day rate.
Block Servicing Contract
Quoted per block
Annual planned servicing across the whole block, with the per-unit rate improving as the unit count rises. Includes resident access coordination and full reporting.
Send us a unit schedule or a flat count and we will come back with a written proposal, a programme and a realistic completion date.
Frequently Asked Questions
What does HIU commissioning involve?
Do you commission HIUs in occupied blocks as well as new builds?
How many units can you commission or service in a day?
Which commissioning standard do you work to?
Can you take over an annual servicing contract from another contractor?
Do you coordinate resident access?
Which HIU brands do you cover?
Got a Block That Needs Commissioning or Servicing?
Send us the unit count and the HIU brand and we will come back with a proposal, a programme and a completion date you can put in front of your client.